Equipment Summary
Description
State-of-the-art Helium Processing Plant, Production Capacity of 1459MSCFD @ 250 psig at Inlet and 1021MSCFD @ 225 psig at Outlet. Built in 2018 with Major Upgrade in 2022. Additional available with this is a steel building, disassembled/packaged for shipping.
Key Features: Advanced cryogenic distillation / PSA technology, Upgradable to liquidation, Co2 stripper may be added, High-purity helium production (99.999% purity capability), Integrated quality control systems, Automated process control and monitoring with current software on file
This plant was originally built at a cost of over $12 Million Dollars, it is now priced at a fraction of that, Amazing DEAL on this plant
Message us below for Pricing